Growing Science » Tags cloud » Scrap
Authors: Yuan-Shyi P. Chiu, Ya-Lei Lo, Fan-Yun Pai, Victoria Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2023.11.002
Keywords: Fabricating-shipping system, Hybrid multi-item batch system, Adjustable rate, Postponement, Scrap, Multiple shipments, Subcontracting
Journal: IJIEC | Year: 2024 | Volume: 15 | Issue: 1 | Views: 391 | Reviews: 0
Authors: Yuan-Shyi P. Chiu, Jian-Hua Lian, Fan-Yun Pai, Tiffany Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2023.9.010
Keywords: Buyer-vendor coordination, Runtime planning, Scrap, Multi-shipment, Breakdowns, Overtime, External source
Journal: IJIEC | Year: 2024 | Volume: 15 | Issue: 1 | Views: 533 | Reviews: 0
Authors: Yuan-Shyi Peter Peter Chiu, Ya-Lei Lo, Tsu-Ming Yeh, Yunsen Wang, Hung-Yi Chen
DOI: 10.5267/j.ijiec.2022.11.002
Keywords: Hybrid EPQ model, Scrap, Delayed differentiation, Multiproduct system, Multi-shipment policy, Supply Chain Performance
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 2 | Views: 661 | Reviews: 0
Authors: Yuan-Shyi P. Chiu, Zhong-Yun Zhao, Fan-Yun Pai, Tiffany Chiu
DOI: 10.5267/j.ijiec.2022.9.001
Keywords: Multiproduct replenishing decision, Delayed differentiation, External supplier, Postponement, Product quality issue, Scrap
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 1 | Views: 741 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Yunsen Wang, Tsu-Ming Yeh, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2022.4.001
Keywords: Fabricating runtime, Probabilistic breakdowns, Overtime, Scrap, Outsourcing
Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 3 | Views: 1086 | Reviews: 0
Authors: Yuan-Shyi P. Chiu, Jian-Hua Lian, Victoria Chiu, Yunsen Wang, Hsiao-Chun Wu
DOI: 10.5267/j.ijiec.2021.9.003
Keywords: Mathematical modelling, Multiproduct fabrication, External supplier, Overtime, Scrap, Postponement, Rotation cycle, Batch production
Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 1 | Views: 1307 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Huei-Hsin Chang, Tiffany Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2020.9.003
Keywords: Multi-item manufacturing, Outsourcing, Delayed differentiation, Rework, Scrap, Batch fabrication
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 1 | Views: 1138 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Zhong-Yun Zhao, Singa Wang Chiu, Victoria Chiu
DOI: 10.5267/j.ijiec.2020.1.004
Keywords: Fabrication runtime, Unreliable machine, Outsourcing, Vendor-buyer coordinated system, Multi-shipment, Scrap
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1122 | Reviews: 0
Authors: Hong-Dar Lin, Tiffany Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.uscm.2022.2.007
Keywords: Multi-item system, Fabrication-shipment policy, Scrap, Rework, Multi-delivery, Overtime
Journal: USCM | Year: 2022 | Volume: 10 | Issue: 3 | Views: 708 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Yu-Ru Chen, Victoria Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2018.6.005
Keywords: Operations Management, Fabrication cycle length, Stochastic failure, Backlog, Rework, Scrap, Acceptable service level
Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 2 | Views: 1510 | Reviews: 0
® 2010-2024 GrowingScience.Com