manufacturing systems so that operations of a given lot can be overlapped. This technique can
reduce manufacturing makespan and is an effective tool for time-based manufacturing strategy.
Several research articles appeared in literature to solve this problem and most of these studies
are limited to pure flowshop environments where there is only a single machine in each stage.
On the other hand, because of the applicability of hybrid flowshops in different manufacturing
settings, the scheduling of these types of shops is also extensively studied by several authors.
However, the issue of lot streaming in hybrid flowshop environment is not well studied. In this
paper, we aim to initiate research in bridging the gap between the research efforts in flowshop
lot streaming and hybrid flowshop scheduling. We present a comprehensive mathematical
model for scheduling flexible hybrid flowshop with lot streaming. Numerical example
demonstrated that lot streaming can result in larger makespan reduction in hybrid flowshop
where there is a limited research than in pure flowshop where research is abundant.