Growing Science » Countries » Canada
Authors: Seyed Jafar Sadjadi, Soheil Sadi-Nezhad
Keywords: Oil and gas industry, TOPSIS, Green gas effect
Journal: JPM | Year: 2017 | Volume: 2 | Issue: 3 | Views: 1799 | Reviews: 0
Authors: Mohammad Reza Ghaeli, Soheil Sadi-Nezhad
Keywords: GERT, Graphical evaluation and re-view techniques, Network design
Journal: JPM | Year: 2017 | Volume: 2 | Issue: 3 | Views: 1462 | Reviews: 0
Authors: Mohammad Hossein Karimi, Emran Mohammadi, Hamed Jafari, Mohammad Reza Ghaeli, Amirhossein Eskoruchi
Keywords: EMS stations location, Mathematical modeling, Robust optimization, Emergency medical services (EMS)
Journal: JFS | Year: 2022 | Volume: 2 | Issue: 2 | Views: 779 | Reviews: 0
Authors: Salim Lahmiri
DOI: 10.5267/j.dsl.2013.01.001
Keywords: Econometrics, GARCH-M, MENA Stock Markets
Journal: DSL | Year: 2013 | Volume: 2 | Issue: 2 | Views: 1963 | Reviews: 0
Authors: Fantahun M. Defersha
DOI: 10.5267/j.ijiec.2010.07.006
Keywords: Hybrid flexible flowshop, Lot streaming, Mathematical model, Scheduling
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 2 | Views: 2672 | Reviews: 0
Authors: Sam Khoury, Kouroush Jenab, Donald Staub, Mark Rajai
DOI: 10.5267/j.msl.2011.11.003
Keywords: Database Technology, Early Alert, STEM, TQM
Journal: MSL | Year: 2002 | Volume: 2 | Issue: 2 | Views: 2021 | Reviews: 0
Authors: Soheil Sadi-Nezhad
Keywords: Project selection, TOPSIS, AHP, ANP, VIKOR
Journal: JPM | Year: 2017 | Volume: 2 | Issue: 1 | Views: 3053 | Reviews: 0
Authors: Samer Ben Issa, Yiliu Tu
Keywords: Integrated planning and scheduling process, Resource constrained project scheduling problem (RCPSP), Activities splitting, Minimum Moments of Resources Required (MMORR)
Journal: JPM | Year: 2017 | Volume: 2 | Issue: 1 | Views: 1876 | Reviews: 0
Authors: Ebrahim Sharifi
Keywords: Global warming, Wildfire, Forest fire, Climate change, Natural disasters
Journal: JFS | Year: 2022 | Volume: 2 | Issue: 1 | Views: 1058 | Reviews: 0
Authors: Alberto Herrán, Fantahun M. Defersha, Mingyuan Chen, Jesús M. de la Cruz
DOI: 10.5267/j.ijiec.2010.06.004
Keywords: Multiproduct pipeline, Production, Transportation, Planning and scheduling, Multi−period model
Journal: IJIEC | Year: 2011 | Volume: 2 | Issue: 1 | Views: 2465 | Reviews: 0
® 2010-2024 GrowingScience.Com