Growing Science » Authors » Yuan-Shyi Peter Chiu
Authors: Yuan-Shyi Peter Chiu, Victoria Chiu, Yunsen Wang, Ming-Hon Hwang
DOI: 10.5267/j.ijiec.2020.6.001
Keywords: Multiproduct replenishment decision, Postponement, Overtime, Product quality reassurance, Commonality, Common cycle time
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 1555 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Singa Wang Chiu, Tiffany Chiu, Hui-Chi Wang
Keywords: Optimization, Manufacturing system, Machine failures, Runtime, Rework, Expedited-rate, External source
Journal: DSL | Year: 2022 | Volume: 11 | Issue: 4 | Views: 648 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Zhong-Yun Zhao, Singa Wang Chiu, Victoria Chiu
DOI: 10.5267/j.ijiec.2020.1.004
Keywords: Fabrication runtime, Unreliable machine, Outsourcing, Vendor-buyer coordinated system, Multi-shipment, Scrap
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1122 | Reviews: 0
Authors: Singa Wang Chiu, Yi-Jing Huang, Chung-Li Chou, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.ijiec.2019.6.006
Keywords: Production planning, Manufacturing runtime decision, Expedited fabrication rate, Stochastic failure, Random scrap
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 1 | Views: 1544 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Ting-Fang Yan, Yunsen Wang, Hui-Chi Wang
DOI: 10.5267/j.uscm.2022.10.005
Keywords: Postponement, Multiproduct system, Replenishment-shipment, Finite production rate, Rework, Subcontracting
Journal: USCM | Year: 2023 | Volume: 11 | Issue: 1 | Views: 542 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Hui-Cun Chen, Huei-Hsin Chang, Ming-Hon Hwang
DOI: 10.5267/j.ijiec.2019.4.001
Keywords: Multi-item fabrication, External provider, Rework, Vendor-buyer integrated system, Rotation cycle, Intra-supply chain, Distribution frequency
Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 4 | Views: 1421 | Reviews: 0
Authors: Singa Wang Chiu, Yi-Jing Huang, Yuan-Shyi Peter Chiu, Tiffany Chiu
DOI: 10.5267/j.ijiec.2018.11.001
Keywords: Multiproduct inventory system, The most economic common cycle time, Expedited fabrication rate, Finite production rate, Random scrap
Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 3 | Views: 1565 | Reviews: 0
Authors: Hong-Dar Lin, Tiffany Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.uscm.2022.2.007
Keywords: Multi-item system, Fabrication-shipment policy, Scrap, Rework, Multi-delivery, Overtime
Journal: USCM | Year: 2022 | Volume: 10 | Issue: 3 | Views: 708 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Yu-Ru Chen, Victoria Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2018.6.005
Keywords: Operations Management, Fabrication cycle length, Stochastic failure, Backlog, Rework, Scrap, Acceptable service level
Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 2 | Views: 1511 | Reviews: 0
Authors: Hong-Dar Lin, Victoria Chiu, Hua-Yao Wu, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.uscm.2021.10.008
Keywords: Manufacturer-retailer system, Multiproduct, Delayed differentiation, Adjustable-rate, Multi-shipment
Journal: USCM | Year: 2022 | Volume: 10 | Issue: 1 | Views: 700 | Reviews: 0
® 2010-2024 GrowingScience.Com