Growing Science » Authors » Victoria Chiu
Authors: Yuan-Shyi Peter Chiu, Victoria Chiu, Tiffany Chiu, Tsu-Ming Yeh, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2024.11.001
Keywords: Multi-item EPQ system, Manufacturing-delivery policy, Overtime, Postponement, Multi-shipment, Quality assurance, External source
Journal: IJIEC | Year: 2025 | Volume: 16 | Issue: 1 | Views: 38 | Reviews: 0
Authors: Yuan-Shyi P. Chiu, Ya-Lei Lo, Fan-Yun Pai, Victoria Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2023.11.002
Keywords: Fabricating-shipping system, Hybrid multi-item batch system, Adjustable rate, Postponement, Scrap, Multiple shipments, Subcontracting
Journal: IJIEC | Year: 2024 | Volume: 15 | Issue: 1 | Views: 391 | Reviews: 0
Authors: Yuan-Shyi P. Chiu, Hung-Yi Chen, Victoria Chiu, Singa Wang Chiu, Hsiao-Chun Wu
DOI: 10.5267/j.ijiec.2023.6.002
Keywords: Multi-item manufacturing-delivery, Postponement, Subcontracting, Quality assurance, Supply-chain, Multiple deliveries
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 4 | Views: 473 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Singa Wang Chiu, Fan-Yun Pai, Victoria Chiu
DOI: 10.5267/j.ijiec.2022.10.001
Keywords: Manufacturing planning, Operating expenditures, Quality reassurances, Probabilistic failures, Overtime, Outsourcing
Journal: IJIEC | Year: 2023 | Volume: 14 | Issue: 1 | Views: 806 | Reviews: 0
Authors: Yuan-Shyi P. Chiu, Jian-Hua Lian, Victoria Chiu, Yunsen Wang, Hsiao-Chun Wu
DOI: 10.5267/j.ijiec.2021.9.003
Keywords: Mathematical modelling, Multiproduct fabrication, External supplier, Overtime, Scrap, Postponement, Rotation cycle, Batch production
Journal: IJIEC | Year: 2022 | Volume: 13 | Issue: 1 | Views: 1307 | Reviews: 0
Authors: Singa Wang Chiu, Victoria Chiu, Ming-Hon Hwang, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.ijiec.2021.1.001
Keywords: Multiproduct batch manufacturing, Delayed differentiation, Overtime, Outsourcing, Quality reassurance
Journal: IJIEC | Year: 2021 | Volume: 12 | Issue: 2 | Views: 1354 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Victoria Chiu, Yunsen Wang, Ming-Hon Hwang
DOI: 10.5267/j.ijiec.2020.6.001
Keywords: Multiproduct replenishment decision, Postponement, Overtime, Product quality reassurance, Commonality, Common cycle time
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 4 | Views: 1555 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Zhong-Yun Zhao, Singa Wang Chiu, Victoria Chiu
DOI: 10.5267/j.ijiec.2020.1.004
Keywords: Fabrication runtime, Unreliable machine, Outsourcing, Vendor-buyer coordinated system, Multi-shipment, Scrap
Journal: IJIEC | Year: 2020 | Volume: 11 | Issue: 3 | Views: 1122 | Reviews: 0
Authors: Yuan-Shyi Peter Chiu, Yu-Ru Chen, Victoria Chiu, Singa Wang Chiu
DOI: 10.5267/j.ijiec.2018.6.005
Keywords: Operations Management, Fabrication cycle length, Stochastic failure, Backlog, Rework, Scrap, Acceptable service level
Journal: IJIEC | Year: 2019 | Volume: 10 | Issue: 2 | Views: 1510 | Reviews: 0
Authors: Hong-Dar Lin, Victoria Chiu, Hua-Yao Wu, Yuan-Shyi Peter Chiu
DOI: 10.5267/j.uscm.2021.10.008
Keywords: Manufacturer-retailer system, Multiproduct, Delayed differentiation, Adjustable-rate, Multi-shipment
Journal: USCM | Year: 2022 | Volume: 10 | Issue: 1 | Views: 699 | Reviews: 0
® 2010-2024 GrowingScience.Com